REDCO PROCESS ENGİNEERİNG ENERGY TECHNOLOGİES
Odor Control System
Removal of high concentrations of Hydrogen Sulfide (H₂S) and Ammonia (NH₃) in Industrial and Domestic Wastewater Treatment Plant Pumping Stations; installation of a multi-stage Chemical Scubber (Gas Scrubber) System due to the contrasting acidic and basic characteristics of the gases.

Project Details
| Project Name | Odor Control System |
|---|---|
| Client Company / Institution | Redco Process Engineering Energy Technologies |
| Capacity | 16.500 m³/Hour |
| Year Built | 2022 |
| Location | Primosten / Hırvatistan |
| Project Status | Completed |
| Scope of Work | Engineering / Mechanical / Electrical & Automation |
Two-Stage Wet Scrubber
Highlights
Stable output values below discharge limits
Savings in chemical consumption with automatic dosing